The company has over the years performed some special projects that require special attention and are usually fast track projects. Some of the projects include :

• The removal of a reinforced wall using specialized core drilling equipment at the waste water treatment plant at Ta Barkat l/o Xaghjra a job that had to be performed in 12 hours.
• The construction of ‘mattresses’ to protect and cover underwater cables. These mattresses were constructed out of a geo-textile material, of steel netting, hot asphalt and quarried stone at a local plant in Malta. They were then transported by trailer to awaiting barges and the placed over the underwater cables.

• The preparation of formwork and the construction (some on them on a barge) of large concrete structures to be used as mooring buoys/anchorage for super yachts in a local marina